Case Study
Structural steel to underpin an existing building as part of a major redevelopment.
We fabricated and installed 330 tonnes of structural steel to underpin a live building. All elements were produced from approved client drawings, with timing critical to deadlines. The project required complex splice connections to suit tight spaces and irregular layouts. With the building remaining occupied throughout the works, sequencing was paramount — every phase had to be planned to maintain structural integrity at all times while allowing the permanent steelwork to be threaded in without disruption to the floors above. Our installation team worked in phased shifts to maintain progress while managing the risks of the live environment, completing the package on programme and without incident.
We have consistently engaged G&H Steel to assist Keltbray with manufacturing and installation services and have always been impressed by their dedication and commitment. G&H has successfully helped us complete major tier 1 projects such as Peterborough Court, Woolgate, and West Hendon.
Mark Briggs
Project Manager, Keltbray